工程案例

Return list

Urumqi International Airport Project in Xinjiang

2023-06-20


Project Name: Urumqi International Airport Project in Xinjiang
Project Location: Urumqi, Xinjiang
Seismic Fortification Intensity: Magnitude 8 (0.2g)
Building Area: 900,000 square meters
Products Used:
LRIB Building Isolation Rubber Bearings
ESB Elastic Sliding Plate Bearings
BRB Buckling Restrained Energy Dissipating Braces
MYD_M Metal Yielding Dampers
Project Features:

  • After the completion of the project, it can meet the passenger throughput of 63 million person-times and the cargo and mail throughput of 750,000 tons, which are 3 times and 4.4 times of the current ones respectively.
  • The maintenance-free period is not less than 50 years; the working temperature ranges from -40 °C to 60 °C; and the durability reaches 100 years.